Located on the Peri River, a tributary of the Euphrates River, on the border of Elazığ and Tunceli provinces, the Tatar Dam and Hydroelectric Power Plant began operating in 2013 The plant has an installed capacity of 131 MW and average annual production capacity of 421 million kWh.
In 2024, the plant’s production volüme was 386.16 million kWh.
The Tatar Hydroelectric Power Plant Has successfully completed its Carbon Emission Reduction Certification and Social Carbon Validation studies in accordance with international carbon standards.