Pembelik Dam and Hydroelectric Power Plant

The Gravity Dam of Peri Stream

Located, within the borders of Elazığ province, on the Peri River, a tributary of the Euphrates River, the Pembelik Dam and Hydroelectric Power Plant began operating in 2015. The plant has an installed capacity of 130 MW and an average annual production capacity of 410 million kWh.
In 2024, the production volüme was 355.94 million kWh

The Pembelik Hydroelectri Power Plant has successfully completed its Carbon Emission Reduction Certification and Socail Carbon Validation studies in accordance with international carbon standards.