Kargı Dam and Hydroelectric Power Plant

The Award-Winning Energy Plant

Located on the Sakarya River within the boundaries of Beypazarı district in Ankara province, Karga Dam and Hydroelectric Power Plant was commissioned in April 2017.

In 2019, Kargı Dam and HEPP attained the Efficiency Award in the Hydroelectric Category at the Energy Awards Competition organized within the scope of ICCI 2019, held with the theme of “Change and Transformation in Energy”.

As the largest private-sector hydroelectric power plant in the Sakarya basin, Kargı Dam and HES has an installed capacity of 100 MW. Its average annual production capacity reaches 254 million kWh, with a production volüme of 119,792.02 kWh in 2024.