Kargı Dam and Hydroelectric Power Plant

The Award-Winning Energy Plant

Located on the Sakarya River within the boundaries of Beypazarı district in Ankara province, Kargı Dam and Hydroelectric Power Plant was commissioned in April 2017.

As the largest private-sector hydroelectric power plant in the Sakarya basin, Kargı Dam and HEPP has an installed capacity of 100 MW. Its average annual production capacity reaches 254 million kWh, with a production volume of 104,464.72 MWh in 2025.