Located on the Sakarya River within the boundaries of Beypazarı district in Ankara province, Kargı Dam and Hydroelectric Power Plant was commissioned in April 2017.
As the largest private-sector hydroelectric power plant in the Sakarya basin, Kargı Dam and HEPP has an installed capacity of 100 MW. Its average annual production capacity reaches 254 million kWh, with a production volume of 104,464.72 MWh in 2025.