Kirazlık Regulator and Hydroelectric Power Plant

The Energy Regulator of the Tigris River

Located within the borders of Siirt Province, on the Dicle River and Botan Creek, the Kirazlık Regulator and Hydroelectric Power Plant began operating in 2013. The facility is situated downstream from the Alkumru Hydroelectric Power Plant.

With an installed capacity of 48 MW, the plant has an average annual production capacity of 150 million kWh, with a production volüme of 161,873.13 kWh in 2024.