Located within the borders of Siirt Province on the Büyükçay River-the largest tributary of the Botan Riverthe İncir Dam and Hydroelectric Power Plant (HEPP), situated upstream of the operational Çetin Dam and HEPP, Alkumru Dam and HEPP, and Kirazlık Regulator and HEPP, is scheduled for commissioning in March 2027.
The İncir Dam and HEPP features an RCC-type dam body, standing 150 meters high with a fill volume of 1.9 million cubic meters.
The power plant will have a total capacity of 120 MWe, with an annual average production of 315.070 million kWh, as stated in its production license. With this capacity, it will play a key role in meeting the electricity needs of Siirt and the surrounding provinces.