NEOM Aquellum Project Geotechnical Investigation and Engineering Works, Saudi Arabia

The project, referred to as Phase 2 of the NEOM Magna Region Aquellum Project, involves excavation works associated with a structure located near the Gulf of Aqaba. Following the successful completion of Phase 1, Phase 2 was also completed in 2025.

Within the scope of the project, excavation and support works for the 87-meter-long Mobility Extension Tunnel, a 128-meter-deep vertical shaft excavated using the Raise Boring method, approximately 108 meters of excavation and support works in the Water Tunnel, and 218 meters of rockfall barrier installation works at the southern and northern portals of the Master Plan Tunnel were successfully completed.

In addition, a total of 440 meters of excavation and support works were completed in the Master Plan Tunnel, comprising approximately 425 meters from the southern side and 15 meters from the northern side. Furthermore, approximately 22 meters of full-face tunnel excavation and support works were carried out in the Logistic Tunnel.

We are using cookies at our website to provide a better web site user experience. By continuing with the default settings you will be accepting use of cookies according to our cookie policy .
Allow
Disable
X
X