Under the project agreement signed in October 2024, rehabilitation works will be carried out on Al Salmi Road, one of Kuwait’s major transportation routes. The scope covers maintenance and repair of the 78-kilometer-long road, totaling 1,253,450 square meters, and includes the enhancement of existing road infrastructure along with repair and reinforcement in necessary sections. The project is designed to ensure the road provides longlasting, safe service by renewing the asphalt pavement, maintaining drainage systems, and improving road safety measures.
Currently, work is ongoing on subgrade preparation, excavation, backfilling, and the construction of aggregate subbase and base layers. The project scope further encompasses asphalt milling, repair, and paving works; road marking and traffic signage; installation of highway fences and guardrails, median barriers, and bridge parapets; stormwater drainage and irrigation lines; microtunneling and CCTV systems; and bridge repair works.
The project is scheduled for completion over 36 months, with a warranty period of 60 months.