Within the scope of the license obtained from MTA until 2041, construction of the Buharkent Geothermal Power Plant-planned on the geothermal field located in Kızıldere neighborhood, Buharkent District, Aydın Province-commenced in July 2017 following the drilling of five production and three reinjection wells.
The plant, with an installed capacity of 13.77 MWe, began production in September 2018. In 2024, the plant’s gross production was 110,477 MWh, and its net production was 68,037 MWh.
The Buharkent Geothermal Power Plant’s Cercarbono registration was completed in 2023.