Located in the Erzin district of Hatay Province, the Erzin Solar Power Plant was constructed by Limak under the YEKA tender. At the time construction commenced, the plant was Türkiye’s second-largest in terms of DC capacity; it was completed in 2024 and reached a licensed capacity of 140 MWm / 100 MWe.
Standing out as one of Türkiye’s most innovative and technologically advanced YEKA projects, the Erzin Solar Power Plant utilizes a single-axis tracking system to maximize power generation. A total of 26 solar power units-comprising inverters, transformers, and modules-have been commissioned.
Following inspections conducted at the plant, performance values were confirmed to comply with the criteria set out in IEC 61724, IEC 62446-1, and other international best practice standards. A SCADA monitoring and field tracking system has been installed within the switchgear building, enabling continuous 24/7 monitoring and control by SCADA operators. Based on reports and meter data obtained from the SCADA system, performance ratio (PR) calculations indicate that the plant operates at 99.59% efficiency and meets the production requirements defined in the specifications.
The power plant, which supports Türkiye’s electricity supply security and contributes to the country’s renewable energy vision, was commissioned in phases and reached full capacity in November 2024..
